Malaysia,
Lahad Datu
Lahad Datu
Industrial Power Technology (IPT)
Biomass
Engineer
Performance
36 MW
Steam capacity
50 tph
Operating pressure
39 bar
Steam temperature
450 °C
Application
Combustion bed modelling and CFD simulation of biomass (palm oil waste) burning plant
Related references
your selected business area
Related references
your selected fuel
All references
Fuels
We work with the following fuels.
Select your interest.